ROAD AND BRIDGES


![]() QUWAYRISH INTERCHANGEBaghdad, Iraq Date: 2012 Client: Bairaq Al-Ameer General Trading & Contracting Ltd. Budget: US$ 70 M This proposal for an Interchange in the City of Baghdad. | ![]() PILGRIM'S TUNNEL( PROPOSAL )Kufa, Iraq Date: 2012 Client: Al-Khadraa Al-Muttahida Contracting Co. Budget: US$ This proposal for an underground Tunnel in the City of Kufa. This tunnel has a total of 6 lanes, 3 lanes in each direction. Its main purpose is to transport Pilgrims to and from Masjid Al-Kufa. | ![]() DEVELOPMENT OF BAGHDAD-AL HILLAH Rd.Baghdad-Hilla, Iraq Date: 2012 Client: Bairaq-el-Ameer Company for General Contracting and Trading Budget: US$ 30 M Baghdad-Hilla Road connects between the Capital City Baghdad and the City of Hilla, with a length of 30 Km. The preparation of design drawings according to the technical specifications of roads and bridges (SCRB), and a topographic survey that has been conducted for this project with the design of three traffic overpass interchanges. |
---|---|---|
![]() SAYF SA`D INTERCHANGE IN KARBALAKarbala, Iraq Date: 2007 - 2011 Client: Project International FZE Budget: US$ 15 M For this interchange, traffic study was taken into consideration in design. In addition to the overpass, roads were designed with all approaches needed. Currently, This project consists of a 2-sided overpass with 4 curved ramps and 4 linear ramps. | ![]() SANHARIB INTERCHANGEMosul, Iraq Date: 2010 Client: Nineveh Governorate Budget: US$ 130 M This project is located in the East side of Mosul with length of 2.6 km (two directions). The interchange runs over three interchanges in the following: Al-Faisalyia, Al-Zira`ah with tunnel design with each interchange, and Al-Dhubbat at end of interchange which is considered as one of most complicated traffic interchanges which connects surrounding areas with the West section of Mosul. | ![]() WATER TANK INTERCHARGE PROPOSALSamawa City, Iraq Date: 2010 Client: Al-Khadraa Co. Budget: US$ 16 M This proposal for interchange in the City of Samawa. |
![]() AL-SHUHADA’ INTERCHANGEKirkuk, Iraq Date: 2005-2006 Client: Ministry of Municipalities and Public Works Budget: US$ 6 M Al-Shuhada' Interchange in Kirkuk, Iraq. For this interchange, traffic study was taken into consideration in design. This is a major interchange in Kirkuk. It consists mainly of one 2-sided overpass with all approaches. | ![]() SADR HOSPITALITY INTERCHANGENajaf, Iraq Date: 2010 Client: Al-Khadraa Co Budget: US$ 23 M This Proposal for Interchange to be located in the Holy City of Najaf. | ![]() TAHMAZIYAH INTERCHANGEHilla, Iraq Date: 2005-2008 Client: Ministry Municipalities & Public Works Budget: US$ 5 M For this interchange, traffic study was taken into consideration in design. This is a major interchange in Al-Hillah, Babylon. This interchange consists mainly of one 2-sided overpass with all required approaches. Also, roads were designed to achieve the optimum traffic flow. |
![]() AMARAH BRIDGEAmarah, Iraq Date: 2007 Client: Maysan Governorate Council Budget: US $2.5 M DIJLAH prepared all the necessary engineering drawings and documents for the steel structure bridge in Amarah, South of Iraq. This bridge is located on Al-Izz River in the famous area of marshes, which is a very distinguished area and is well-known landmark for Iraq. The bridge has a length of 100 m. | ![]() AL-QAMISHLI INTERCHANGEBagdad, Iraq Date: 2012 Client: Bairaq Al-Ameer General Trading & Contracting Ltd. Budget: US$ 70 M This proposal for an interchange in the City of Baghdad. | ![]() AL_TESAANE INTERCHANGE (PROPOSAL)Diyala, Iraq Date: 2010 Client: Project International FZE This is proposal for interchange in Diyala City. |
![]() AL-YARMOUK INTERCHANGEMosul, Iraq Date: 2007 Client: Ministry Municipalities & Public Works Budget: US$ 23 M For this interchange, traffic study was taken into consideration in design. This is a major interchange in the city of Mosul and is the largest in scale and cost among 5 interchanges that were designed by DIJLAH. It contains a major and minor overpass with an accurate and complex network of roads. Besides, a tunnel is added to make the traffic flow more flexible. | ![]() AL-SALAM INTERCHANGEBaghdad, Iraq Date: 2009 Client: Baghdad Mayoralty Budget: US$ 18 M The interchange is located in Baghdad (Karkh side) and connects the Al-Bayya' district with the expressway (Salahuddin Al-Ayubi St.) in the direction of North of Baghdad to reduce congestion that occurs at the intersection which connects Al-Bayya' district and Al-Amil district with Al-Jihad district. The work involves the preparation of the intersection and the bridge design of the interchange. | ![]() DEVELOPMENT OF BAGHDAD AL HILLAH Rd.Baghdad-Hilla, Iraq Date: 2012 Client: Bairaq-el-Ameer Company for General Contracting and Trading Budget: US$ 30 M Baghdad-Hilla Road connects between the Capital City Baghdad and the City of Hilla, with a length of 30 Km. The preparation of design drawings according to the technical specifications of roads and bridges (SCRB), and a topographic survey that has been conducted for this project with the design of three traffic overpass interchanges. |
![]() NADIR INTERCHANGEHilla, Iraq Date: 2007 - 2011 Client: Ministry Municipalities & Public Works Budget: US$ 25 M DIJLAH prepared all the necessary engineering drawings and documents for Nadir Interchange in Babylon, Iraq. This project consists of a 2-sided overpass with 4 curved and 4 linear ramps. Traffic study was taken into consideration in our design. In addition to the overpass, roads were designed with all required approaches. Currently, this project is under construction | ![]() AL-SHUHADA' INTERCHANGEKirkuk, Iraq Date: 2005-2006 Client: Ministry Municipalities & Public Works Budget: US$ 6 M For this interchange, traffic study was taken into consideration in design. This is a major interchange in the city of Kirkuk. It consists mainly of one 2-sided overpass with all required approaches. | ![]() AL-MAFRAQ INTERCHANGEDiyala, Iraq Date: 2005-2006 Client: Project International FZE Budget: US$ 15 M DIJLAH prepared all the necessary drawings and documents for Al-Mafraq Interchange in Diyala, Iraq. This project consists of a 2-sided overpass with 4 curved ramps and 4 linear ramps, 2 curved ramps of them are designed in future extension. Traffic study was taken into consideration in our design. In addition to the overpass, roads were designed with all approaches needed. |
![]() UQBAH BIN NAFI` INTERCHANGEBaghdad, Iraq Date: 2007 Client: Baghdad Mayoralty Budget: US$ 13 M The intersection is located in Baghdad (Al-Rasafah side) which connects Al-Tahariyat Square in the Karradah district. The goal is to reduce traffic congestion in Al Za`farniya, Al Bab Al Sharqi route, one of the busiest intersections in Baghdad. The bridge is 500 m in length, 2 directions and 11 spans. | ![]() DEVELOPMENT OF BAGHDAD ABU GHRAIBBaghdad, Iraq Date: 2012 Client: Bairaq Al-Ameer General Trading & Contracting Ltd. Budget: US$ 10 M This is a proposal for Abu Ghraib Street development in Baghdad. | ![]() Sa'ad Square - BasraBasra, Iraq Date: 2006 Client: Ministry of Municipalities and Public Works. Budget: US$ 8 M Sa'd Interchange in Basra City, Iraq. For this interchange, traffic study was taken into consideration in design. In addition to the overpass, roads were designed with all approaches needed. This project consists of a 2-sided overpass with 4 curved ramps and 4 linear ramps. |
![]() SA`D SQUARE INTERCHANGEThis a second photo of the interchange. | ![]() AL-HUSSEIN INTERCHANGEBaghdad, Iraq Date: 2009 Client: Baghdad Mayoralty Budget: US$ 15 M One of interchanges proposed to be constructed in Baghdad to reduce the traffic congestion and traffic bottlenecks for the connecting roads between Al-Amil and Al-Hussein districts and the main road North of Baghdad toward Mosul. The interchange has a length of 550 m, 2 directions and 13 spans. The drawings and technical specifications for this interchange according to by SCRB standards. | ![]() TIS'IN INTERCHANGEKirkuk, Iraq Date: 2007 Client: Project International FZE Budget: US$ 8 M The intersection TIS'IN project is one of the important and strategic projects implemented by the Ministry of Municipalities at a cost of 21 billion and 876 million IQD within the investment budget for the Ministry of Municipalities. The project of the interchange has a length of 680 m and width 14 m, while the total length of the secondary interchange is 133 m and width 8 meters. |
![]() 60TH ST DEVELOPMENT IN AL- AMARAHAmarah, Iraq Date: 2010 Client: Maysan Government Council Budget: US$ We have designed & developed 60th street in Amarah which begins from Al_Hussian interchange to the end edge of Baghdad/Amarah St., the development proposed many high rise office buildings, residential complex, and rehabilitation and redesign some buildings to reflect new panoramic façade to this area also giving power for Maysan Government. | ![]() CITY INTERCHANGE NajafNajaf, Iraq Date: 2010 Client: Al-Khadraa Co Budget: US$ 26 M Two Proposals were submitted for this interchange in the Holy City of Najaf. | ![]() AL-TALA`I` INTERCHANGEBaghdad, Iraq Date: 2008 Client: Baghdad Mayoralty Budget: US$ 32 M This project is considered one of the most complicated traffic intersections in Baghdad (Karkh area). It connects Al-Rahmanyia with July 14 St. and back with length 1 Km with design of 4 connecting loops with each length of 400 m. The interchange runs above railway tracks which comes from Al-Admiyah Station with ensures the avoidance of using the tracks ROWs thus the spans in points reached 50 m. |

Our
LATEST SPECIALS
Describe what you offer here. add a few choice words and a stunning pic to tantalize your audience and leave them hungry for more.

Our
LATEST SPECIALS
Describe what you offer here. add a few choice words and a stunning pic to tantalize your audience and leave them hungry for more.