top of page

COMMERCIAL

- COMMERCIAL PROJECTS -

Hotels

Najaf Hotel  Imam Ali St.

Najaf Hotel Imam Ali St.

Date: 2012 Construction Budget: 8 M USD Client: Al-Ataba Al-Alawiya Al-Moqadasa Beneficiary: Al-Ataba Al-Alawiya Al-Moqadasa Awarding body: (Proposal Only) Awarded body: (Proposal Only) This is proposal for a 5 star Hotel in the Holy City of Najaf. DCE prepared the preliminary architectural designs.

Hotel, Investment Project

Hotel, Investment Project

Najaf, Iraq Date: 2012 Client: Abdul-Rasool Ali Budget: US$ 9.5 M This is for a 5 star Hotel in the Holy City of Najaf.

A SPORT HOTEL - YOUTH VILLAGE

A SPORT HOTEL - YOUTH VILLAGE

Baghdad, Iraq Date: 2010 Client: Ministry of Youth and Sport Budget: US$ 5.5 M DIJLAH has submitted Schematic Conceptual Design for this Youth Sport Hotel in Baghdad.

Najaf Hotel Hayy Al-Husayn

Najaf Hotel Hayy Al-Husayn

Najaf, Iraq Date: 2012 Client: Imam Ali Holy Shrine Budget: US$ 8 M This proposal for a 5 star Hotel in the Holy City of Najaf

HOTEL (12 STORIES) IN NAJAF - HAYY AL-HUSAIN, Najaf, Iraq

HOTEL (12 STORIES) IN NAJAF - HAYY AL-HUSAIN, Najaf, Iraq

Najaf, Iraq Date: 2011 Client: Imam Ali Holy Shrine Budget: US$ 14 M This proposal for a 5 star Hotel in the Holy City of Najaf.

NAJAF HOTEL, HAYY AL-HANNANAH (12 STORIES), Najaf, Iraq

NAJAF HOTEL, HAYY AL-HANNANAH (12 STORIES), Najaf, Iraq

Date: 2011 Construction Budget: 14 M USD Client: Al-Ataba Al-Alawiya Al-Moqadasa Beneficiary: Al-Ataba Al-Alawiya Al-Moqadasa Awarding body: (Proposal Only) Awarded body: (Proposal Only) This is proposal for a 5 star Hotel in the Holy City of Najaf. DCE prepared the preliminary architectural designs for submission.

AIRPORT HOTEL (BAGHDAD PALACE), Baghdad, Iraq

AIRPORT HOTEL (BAGHDAD PALACE), Baghdad, Iraq

Date: 2009 Duration: 2 months Construction Budget: 20 M USD Client: ARCHS Group International Beneficiary: Ministry of Tourism and Antiquities Awarding body: (Proposal Only) Awarded body: (Proposal Only) Dijlah prepared the feasibility study for the construction of 5 star hotel nearby Baghdad International Airport with the partner company ARCHS Group International. The preliminary designs were prepared with site land of 2500 m² and included 90 single room, 90 double room, and 20 suits.

Shopping Malls 

COMMERICIAL  INVESTMENT  CENTER

Hilla, Iraq Date: 2010 Client: Al-Khadraa Co. Budget: US$ 4.5 M This building is comprised of 2 stories and contains several architectural elements both inside and outside. This mall has several shops, cafeteria, internet café and other facilities.

MALL& OFFICE BUILDING- BABYLON

Hilla , Iraq Date: 2010 Client: Al-Khadraa Co. Budget: US $ 6.3 M These are two proposals for Mall and Office Building in the City of Hilla.

MALL& OFFICE BUILDING- BABYLON

Hilla , Iraq Date: 2010 Client: Al-Khadraa Co. Budget: US $ 6.3 M These are two proposals for Mall and Office Building in the City of Hilla.

SINA’A SHOPPING MALL CENTER

Baghdad, Iraq DATE: 2010 Client: Iyat Al Nor Co. Budget: US$ 4.2 M This investment project is composed of a shopping mall center in Baghdad for an Iraqi private sector. This project contents is five stories including the basement with a car park and restraints.

COMMERCIAL BUILDING (12 STORIES)

Hilla, Iraq Date: 2010 Client: Al-Khadraa Co. Budget: US$ 8 M This building has 2 parts. The front one is an office building (12 stories), the back one is a mall (3 stories), and a 2-level car parking under the mall

SHOPPING MALL CENTER (RAMADI MALL)

Ramadi, Iraq Date: 2010 Client: Al-Moltaqa Group Budget: US$ 5 M This is a multi-use center. Its content 8 levels as medical care, shopping mall, car park and privet offices this project funded by Iraqi privet sector Al-Multaqa. The project is located in largest city in the country, this design matching with culture of AL-Ramadi City. The design process passed in several development stages, finally to reach the best proposed solution

AL-MASAR MALL FOR ELECTRONICS, Baghdad, Iraq

Date: 2017 Duration: 9 months Construction Budget: 3 M USD Client: Al-Masar Company Beneficiary: Al-Masar Company Awarding body: Al-Masar Company Awarded body: Dijlah Consulting Engineers Dijlah designed this commercial building project, located in Baghdad nearby the University of Technology and computers & IT central market. It serves the extensive market need for computer appliances. It is composed of six floors. Total built up area is 4600 m2.

AL-GHAZALIYA MARKET, Baghdad, Iraq

Date: 2012 Duration: 2 months Construction Budget: 1.5 M USD Client: Lalah Company for Contracting Beneficiary: Baghdad Investment Commission Awarding body: Baghdad Investment Commission Awarded body: (Proposal only) Dijlah prepared the preliminary designs and economic feasibility study for this local market. The site area is 1750 m2.The design consists of ground and first floor with open café at the rooftop, the feasibility study includes all the properties of the market, construction cost. Etc

Administration 

Commercial building at Kahramana Sq.

Commercial building at Kahramana Sq., Baghdad, Iraq Date: 2017-2018 Commercial building (8 floors with basement) located nearby Kahramana square. Dijlah prepared the complete designs for this project.

Bank of Baghdad HQ

BANK OF BAGHDAD – HQ BUILDING, Baghdad, Iraq Date: 2017-2018 DIJLAH submitted the complete MEP designs of the New HQ of Bank Of Baghdad in collaboration with CADINI Group (Italian based consultancy firm) that is doing the architectural & structural design.

AlMaamoura building

Baghdad, Iraq Date: 2009 Client: Al-Mamoura Co. Budget: US$ 2.3 M This is an Office Building located in Karradah, Baghdad.

Bank Duhok

Duhok, Iraq Date: 2007 Budget: US$ 2.6 M DIJLAH prepared all the necessary drawings and documents for an office bank/office building in Duhok, North of Iraq. The design of this building used the architectural style of curtain wall. This is a high-rise building in Duhok, Kurdistan of Iraq. It is a building that is distinguished with its modern and stylish design that is based on using glass and curtain wall with modular divisions for millions.

Maysan Tower

Maysan, Iraq Date: 2009 Client: Maysan Governorate Council Preliminary Design DIJLAH submitted engineering drawings for this project in cooperation with D.A.T.A. Consultancy Firm in London, UK (on a joint venture basis). This tower is composed of 32 floors; each floor is of an area of 500 M^2. It is a commercial tower with recreation section and restaurants, art galleries, and a media center.

ANNEX BUILDING AT MINISTRY OF FOREIGN AFFAIRS, Baghdad, Iraq

Date: 2019 Duration: (Proposal only – Architectural Contest) Construction Budget: 15 M USD (Estimated) Client: Ministry of Foreign Affairs Beneficiary: Ministry of Foreign Affairs Awarding body: Ministry of Foreign Affairs Awarded body: (Proposal only – Architectural Contest) DIJLAH participated in the architectural design contest for the annex building project and submitted the designs, architectural model, technical report, design philosophy, and the estimated construction cost.

BANK OF BAGHDAD – BRANCH IN BAGHDAD MALL, Baghdad, Iraq

Date: 2017 Duration: 2 months Client: Al-Ameen Real Estate Investment CO. Beneficiary: BANK OF BAGHDAD Awarding body: BANK OF BAGHDAD Awarded body: Al-Ameen Real Estate Investment CO. We prepared the interior design of the branch of Bank of Baghdad in the Baghdad Mall. The complete design includes architectural design, list of materials, details of fixation and installation of materials & components, HVAC, Electrical & Communications designs.

Parking Structures

MULTI-STORY CAR PARK BUILDING

MULTI-STORY CAR PARK BUILDING

Amarah, Iraq Date: 2008 Client: Maysan Governorate Council Budget: US$ 8 M This building is composed of 6 stories. It contains a mall, 23 medical clinics, car parking areas (363 lots), and a restaurant. The design attitude used here is based upon using new form and interior design and by applying several facilities in one building. Here, DIJLAH used a structural system based upon using hollow core pre-cast slabs.

MULTI-STORY CAR PARK BUILDING

MULTI-STORY CAR PARK BUILDING

Kirkuk, Iraq Date: 2007 Client: Ministry of Municipalities and Public Works Budget: US$ 7 M The design attitude used here is based upon giving this building a modern look throughout using new elements and materials. The building is situated in the city center and will give this area an impressive look.

MULTI-STORY CAR PARK BUILDING

MULTI-STORY CAR PARK BUILDING

Mosul, Iraq Date: 2007 Client: Ministry of Municipalities and Public Work Budget: US$ 9 M This building is composed of 5 stories. The architectural design attitude used here is based upon using the features of Islamic and Arabic heritage in architectural facades. This building is located in a very crowded area in Mosul, and will serve the traffic jam there.

MULTI-STORY CAR PARK BUILDING

MULTI-STORY CAR PARK BUILDING

Basra, Iraq Date: 2007 Client: Ministry of Municipalities and Public Works Budget: US$ 9 M DIJLAH made the complete engineering design set of Basra Multi Story Car Park Building. This building is composed of 6 stories. The design attitude used here is based upon giving this building a unique architectural attitude that makes this building a landmark for the City of Basra. The site of this building has a very beautiful view on Shatt-Al-Arab.

MULTI-STORY CAR PARK BUILDING

MULTI-STORY CAR PARK BUILDING

Hilla, Iraq Date: 2007 Client: Ministry Municipalities & Public Works Budget: US$ 6 M This building is composed of 4 stories. The design attitude used here is based upon giving this building a modern look throughout using new elements and materials. The building is situated in the city center and will give this area an impressive look.

MULTI-STORY CAR PARK BUILDING, Wasit, Iraq

MULTI-STORY CAR PARK BUILDING, Wasit, Iraq

Date: 2007 Duration: 1 year (Design) & 1 year (Supervision) Construction Budget: 7.6 M USD Client: Ministry Municipalities & Public Works Beneficiary: Ministry of Municipalities and Public Works Awarding body: Ministry of Municipalities and Public Works Awarded body: Dijlah Consulting Engineers Dijlah made the complete design drawings of Kut Multi-Story Car Park Building. This building is composed of 7 stories. Dijlah prepared the complete designs and supervised the work of the project.

bottom of page