REHABILITATION FACILITIES
 BAGHDAD HOTELBaghdad, Iraq
Date: 2011
Client: Ministry of Foreign Affairs-Preparatory Committee For Arab Summit
Budget: US$ 14 M
This high rise 5 stars Hotel in the heart of the Capital City of Baghdad was renovated in preparation for the Arab Summit held in Baghdad. |  BABYLON HOTEL Baghdad, Iraq
Date: 2011
Client: Ministry of Foreign Affairs-Preparatory Committee For Arab Summit
Budget: US$ 30 M
This magnificent 5 star Hotel in the heart of the Capital City of Baghdad was renovated in preparation for the Arab Summit to be held in Baghdad.
|  MINISTRY OF PLANNINGBaghdad-Iraq
Date: 2004
Client: Ministry of Planning
Budget: US$ 25 M
DIJLAH in joint venture with Dar Al-Amara Consulting Engineers, prepared all drawings and documentation for the Ministry of Planning and Development Cooperation to rehabilitate as a turn-key project after being bombed in the last Gulf War in March 2003. The building was severely damaged and burnt which requires a total make over. DIJLAH proposed preliminary redesign for the Ministry building. |
---|
 MINISTRY OF INDUSTRYProject Commencement: 7/2004
Project Completion: 1/2005,
Total Project Cost: 5 Million US$
Location of Project: Baghdad – IRAQ Consultant: Dijlah Consultant Engineers, joint venture with Diwan |
---|